House

House
Front of house

Saturday, 19 June 2010

House picture

This is the house before the drillers arrive (taken in April in fact). The flat area in front is where the holes will go, and yes they have to avoid the topiary and the giant chessboard (lower right)! The heat pump will go in the washroom/study building on the right (with the balcony) and the heat pipes run through to the main house via the (unheated) garden room/conservatory. The washroom/study is also formally unheated (just machines etc. & the S-facing balcony doors) but is very well insulated - OK for the comparatively cold-blooded!

No comments:

Post a Comment