Tuesday, 27 July 2010

Pipes in


Well that is all the ground loop pipes in. Pressure testing still seems to show some decline (5 bar to 4 in an hour or so) so we shall see.

The missing valve came in OK.

The actual heat pump delivery is now scheduled for 3 weeks time or thereabouts.

It will be good to get the drive back!

It is interesting to see that the soil/clay/rock in the drive bed is quite layered and varies with position. I suppose the area has been a yard for centuries and must have seen a good deal of change.