Well that is almost it - the old single-phase cable is out of the house and cut back to a point below the pavement. One surprise is that there is an existing dividing point in it (ie resulting in a second cable) just below pavement level. I note that this surprises them, too - so records of the 10-year-old installation are clearly patchy!. The second cable heads up the road in the direction of the neighbor's round the bend, though in this case the new installation should have encountered it.
And naturally the cable-remove crew can dig the hole but we need another team to fill it in and cover over - probably in a day or two..
Note added 20/11/10 - make that TWO more teams to visit! One has been and filled in the hole, but we still await the team that covers it with tarmac.