Well the crew came back (albeit not exactly 'first thing'!) but were unable to get the right cable into the wrong duct - it is a pretty tight fit. They also managed to leave it with no rope through.
After they left another crew came who also could not get the right cable through the wrong duct. They stayed for some hours after which another crew came who could not do it too, and are now digging up the road again (without lights this time) to put the right duct in.
Oh - and the meter box was the wrong way up - but we have now fixed this!
Meanwhile the existing boiler is out - so no heating!
And the man came to change the meter - helpful but obviously nothing for him to do (so the initial crew did not tell him as promised). Still, they have been quite helpful and we have a number to call to get an emergency meter fit at 3 hours notice.
***
Well the self-proclaimed A-team did get the correct cable and duct in OK, and the joining team should be back 8.00am tomorrow, so we are about 24 hours behind on the 3-phase supply but should still be OK. Meanwhile the plumbing is pretty much done and the circuits filled. So we have ended on a more positive note!