Well after a hiatus (not quite as long as it looks - the plasterers have been fitting foam-insulated plasterboard under the sloping roof ceilings that are universal on the top floor as this is the only way to improve the insulation) the plumbers are back and fitting this Tardis-like arrangement. It is fine except that the elaborate effort to make sure that the ground loops nearest the house are on the return (warmer) side went wrong so they will have to fit pipes swapping this round!
The heat pump has fittings for hot water that we are not using (which seems a waste) & we will just join these up to seal them (Ice Energy say one could blank them). The programming should ensure that they are never used.
3 phase power is due on 18th, with commissioning on 21st (the old boiler will need to be removed between these dates).